Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Thom J. Hodgson
Information about the author Thom J. Hodgson will soon be added to the site.
Found
12 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure
2007
This paper addresses a static, n -job, single-machine scheduling problem with sequence...
Dynamic lot size/sequencing policies in a multi-product, single-machine system
1997
This paper is concerned with the modeling and analysis of a single-machine,...
Dry-or-buy decision support for dry kiln scheduling in furniture production
2001
In this paper, a dry-or-buy cost model for a dry kiln scheduling problem in the...
The deployment analysis network tool extended
2001
The Deployment Analysis Network Tool Extended (DANTE) is an analysis tool for studying...
Dry kiln scheduling in furniture production
1999
In this paper, a dry kiln scheduling problem from the furniture manufacturing industry...
Ready-time scheduling with stochastic service times
1997
A frequently encountered scheduling problem is to determine simultaneously a material...
Satisfying due dates in large job shops
1998
For the multi-machine job shop scheduling problem, a conceptually simple...
Multi-objective stochastic scheduling of job ready times
1997
A fundamental scheduling problem is to determine a production start (ready) time based...
Development of a production planning system: A case history
1990
A division of a large manufacturing company produces a homogeneous product in several...
Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
1991
The strategies developed in part I of this paper are extended to a more general case...
Single aircraft mid-air refueling using spherical distances
1990
This paper addresses the problem of a single military transport aircraft that must...
Kanban controlled pull systems: An analytic approach
1989
Three problem areas exist in designing and implementing a kanban controlled JIT...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers