Keyword: flowshop

Found 221 papers in total
The simple F2//Cmax with forbidden tasks in first or last position: A problem more complex than it seems
2005,
The classical F2//C max problem is solved optimally by the famous Johnson's algorithm...
A note on flow-shop and job-shop batch scheduling with identical processing-time jobs
2005,
We address a batch scheduling problem of n identical processing time jobs on an m...
Group scheduling in flexible flow shops
2005,
Flexible flow shops are becoming increasingly common in industry practice due to...
Minimizing total tardiness of orders with re-entrant lots in a hybrid flow shop
2005,
This study focuses on a hybrid flowshop scheduling problem, in which there are serial...
Minimizing the maximum lateness on a two machine flowshop with batch processors
2004,
This paper considers the following problem: n jobs need to be processed on two...
Flow shop vs. permutation shop with time delays
2005,
This paper considers the evaluation of the worst-case performance ratio between the...
Two ant-colony algorithms for minimizing total flowtime in permutation flowshops
2005,
The problem of scheduling in flowshops with the objective of minimizing total flowtime...
Flow-shop batch scheduling with identical processing-time jobs
2004,
In many practical situations of production scheduling, it is either necessary or...
Multilevel intelligent scheduling and control system for an automated flow shop manufacturing environment
2005,
Current manufacturing scheduling and control systems are incapable of coping with...
Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs
2004,
We consider the problem of scheduling customer orders in a flow shop with the...
Determining the optimal number of sublots in a single-product, deterministic flow shop with overlapping operations
2004,
This paper describes a model for minimizing total costs in a single-product,...
Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
2004,
Ant colony optimization (ACO) is a metaheuristic proposed to derive approximate...
The no-idle flowshop scheduling problem with discounted weight
2003,
This paper discusses the no-idle permutation flowshop scheduling problem, whose...
Flowshop problems with intermediate buffers
2003,
In this paper the following extension of the classical flowshop problem is considered:...
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
2004,
The scheduling problems have been discussed in the literature extensively under the...
A note on minimizing maximum lateness in a two-machine no-wait flowshop
2004,
Job scheduling for a two-machine flowshop where wait time between the first and the...
Optimal algorithms for the no-wait flowshop scheduling problem with discount weights
2003,
This paper discusses the no-wait flowshop scheduling problem, whose objective function...
Scheduling a single server in a two-machine flow shop
2003,
We study the problem of scheduling a single server that processes n jobs in a...
Flow-shop scheduling problem based improved adaptive genetic algorithm
2003,
Two kinds of improved adaptive genetic algorithms and encoding and decoding methods...
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
2004,
This paper considers a variant of the classical problem of minimizing makespan in a...
More on three-machine no-idle flow shops
2004,
Recently Saadani, Guinet, and Moalla considered the NP-hard problem of minimizing the...
Adaptive simulated annealing algorithm for flow-shop scheduling problem
2003,
An adaptive simulated annealing algorithm is proposed for the optimal or sub-optimal...
A note on constructive heuristics for the flowshop problem with blocking
2004,
This paper analyzes the minimization of the makespan criterion for the flowshop...
Bottleneck-focused scheduling for a hybrid flowshop
2004,
This paper focuses on a scheduling problem in a hybrid flowshop in which there are...
Papers per page: