Permutation flow shops with exact time lags to minimise maximum lateness

Permutation flow shops with exact time lags to minimise maximum lateness

0.00 Avg rating0 Votes
Article ID: iaor20104540
Volume: 47
Issue: 23
Start Page Number: 6759
End Page Number: 6775
Publication Date: Dec 2009
Journal: International Journal of Production Research
Authors: , , ,
Keywords: flowshop
Abstract:

In this paper we investigate the m-machine permutation flow shop scheduling problem where exact time lags are defined between consecutive operations of every job. This generic model can be used for the study and analysis of various real situations that may arise, for instance, in the food-producing, pharmaceutical and steel industries. The objective is to minimise the maximum lateness. We study polynomial special cases and provide a dominance relation. We derive lower and upper bounds that are integrated in a branch-and-bound procedure to solve the problem. Three branching schemes are proposed and compared. We perform a computational analysis to evaluate the efficiency of the developed method.

Reviews

Required fields are marked *. Your email address will not be published.