Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: IIE Transactions
Found
574 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
On the mean waiting time of a population constrained open tandem queueing network with constant service times
1998,
Perros H.G.
We obtain an approximate expression for the mean waiting time of an open tandem...
Guidelines for selection of manufacturing simulation software
1999,
Paul R.J.
Manufacturing systems have become progressively complex and costly. Simulation is...
An order batching algorithm for wave picking in a parallel-aisle warehouse
2001,
Gademann A.J.R.M. (Noud)
In this paper we address the problem of batching orders in a parallel-aisle warehouse,...
Solving personnel tour scheduling problems using the dual all-integer cutting plane
1998,
Brusco M.J.
Personnel tour scheduling problems are highly relevant to service organizations and...
A branch and cut algorithm for the VRP with satellite facilities
1998,
Bard J.F.
An important aspect of the vehicle routing problem (VRP) that has been largely...
A hybrid shop-floor control system for food manufacturing
2001,
Wysk Richard A.
This paper describes research in the area of hybrid control using simulation including...
Modeling and analysis of dynamic robust design experiments
1999,
Tsui K.L.
This paper investigates the response model approach for the dynamic robust design...
Integrated facilities design using a contour distance metric
2001,
Smith Alice E.
The unequal area facility design problem has been studied in the literature generally...
An efficient procedure for non-stationary inventory control
2001,
Tayur Sridhar
We present an efficient solution method – Direct Derivative Estimation (DDE)...
A framework for decentralized multi-echelon inventory control
2001,
Axster Sven
We provide a cost structure that can be used for decentralized control of a...
Impact on inventory costs with consolidation of distribution centers
2001,
Ou Jihong
The consolidation of Distribution Centers (DCs) is a new trend in global logistics...
Problems in error correction, learning and knowledge of performance in design organizations
1999,
Busby J.S.
A study of five industrial equipment manufacturers found a number of limitations in...
Forming teams: An analytical approach
1999,
Kusiak A.
The selection of multi-functional teams is a key issue in problem solving. Currently...
An implicit enumeration approach to tolerance allocation in sequential tolerance control
1999,
Lehtihet E.A.
The accuracy and precision of a manufactured dimension is largely dependent on the...
Buffer capacity allocation for a desired throughput in production lines
1998,
Altiok T.
In this study, we are concerned with finding the minimum-total-buffer allocation for a...
Manufacturing control of a serial system with binomial yields, multiple production runs, and non-rigid demand: A decomposition approach
1999,
Braha D.
In this paper, the problem of ordering a series of production runs to meet a single...
Designing cellular manufacturing systems with dynamic part populations
1999,
Reasor R.J.
The effectiveness of a cellular manufacturing system is sensitive to fluctuations in...
Geometrical reasoning based on attributed graph grammar for prismatic parts
1999,
Ben-Arieh D.
Modern manufacturing systems rely on a smooth and quick transformation of the design...
Constant Work in Progress (CONWIP)-based production lines with multiple bottlenecks: Performance and design implications
1999,
Herer Yale T.
This research focuses on CONWIP, a closed production control system where all...
The capacitated lot sizing problem with setup carry-over
1999,
Sox C.R.
Although there is a significant amount of literature on the capacitated lot sizing...
A modular, parametric vibratory feeder: A case study for flexible assembly tools for mass customization
1998,
Joneja A.
A new class of parametric and modular flexible tools is proposed to improve the setup...
Buffer sizing models for end-of-aisle order picking systems
1999,
Park B.C.
We study an end-of-aisle order picking system with inbound and outbound buffer...
Optimal parallel funding of research and development projects
1999,
Gerchak Yigal
To insure against the costs of failure, research managers often initiate several...
Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
1999,
Klein Cerry M.
This paper addresses the NP-hard problem of scheduling N independent jobs on a single...
First Page
5
6
7
8
9
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers