Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: International Journal of Production Economics
Found
2380 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Product-line selection, production decisions and allocation of common fixed costs
1994,
Karmarkar Uday
Product costs are determined in practice for the purpose of pricing, make-buy and...
A multicriteria approach to concurrent engineering
1994,
Agrell Per J.
A multi criteria approach to the Design-For-Manufacturability problem is presented, in...
On the transient behaviour of a merge production system with an end buffer
1994,
Gopalan M.N.
In this paper, a merge production system which has two parallel stations in the first...
A formulation and solution methodology for part movement minimization and workload balancing at loading decisions in FMS
1994,
Shanker Kripa
This paper addresses a loading problem with the objective of part movement...
Local search algorithms for flow shop scheduling with fuzzy due dates
1994,
Tanaka Hideo
This paper formulates a fuzzy flow shop scheduling problem where the due-date of each...
Neural network approach for minimizing the makespan of the general job-shop
1994,
Satake Tsuyoshi
A neural network approach is proposed to minimize the makespan of the job-shop...
A study of heuristics for bidirectional multi-hoist production scheduling systems
1994,
Lai K.K.
Scheduling of automated material handling equipment is a commonly encountered problem...
Production scheduling to satisfy worker’s preferences for days off and overtime under due-date constraints
1994,
Yura Kenji
A worker’s satisfaction level on a production schedule is an important factor to...
Adapting traditional breakeven analysis to modern production economics: Simultaneously modeling economies of scale and scope
1993,
Hanna M.D.
Although sophisticated models exist for the justification of advanced manufacturing...
The analytic hierarchy process based expert analysis of strategies and critical success factors of forest industries in Finland
1993,
Tuominin Markku
Competitive forest industries are a necessity for Finland. Last year the forest...
Economy of scope, added value chain and cost dynamics: A tentative optimization model
1993,
Durand T.
The added value chain model shows how products flow through successive design,...
Linear programming optimization of a network for an aluminum plant: A case study
1993,
Farkas Andras
With the dawn of economical and political reforms in Hungary in the mid-1980s the...
Just-in-time shipments in a truck-traffic coordination system
1994,
Hitomi Katsundo
Frequent just-in-time (JIT) deliveries, nowadays widely spread throughout...
Using a knowledge-based decision support system development environment to implement a scheduling system for a workshop
1993,
Klein M.
This paper recalls some of the unsolved problems and difficulties found in scheduling...
Expert system for AGV managing in bidirectional networks: KADS methodology based approach
1994,
Kadi Daoud Ait
This paper presents an expert system prototype for collision avoidance and routing...
A neural-network-based approach for estimating the cost of assembly systems
1993,
Shtub Avraham
Any product that consists of two or more parts requires some form of assembly. The...
Analysis of correlated risky cash flow
1993,
Leung L.C.
In the analysis of a single cash-flow profile under risk, between-period dependency...
A two-level decision-making model for controlling stochastic projects
1993,
Golenko-Ginzburg Dimitri
The paper considers projects with a high level of uncertainty comprising activities of...
Failure predictions in repairable multi-component systems
1993,
Mann L.
Multi-component repairable systems cannot be modeled by continuous distributions, such...
Adaptive diagnostic procedure for failures in a series system
1994,
Jinsheng Gao
Locating faulty (modules) components in a failed system may require costly...
Quality control through lot sizing for items sold with warranty
1994,
Murthy D.N.P.
Due to manufacturing variability, a fraction of the items produced are...
Optimal input control for job-shop type production systems using inverse queueing network analysis
1994,
Kuroda M.
This paper describes an input controlling problem of the job-shop production type...
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
1993,
Rajendran C.
In this article, a heuristic algorithm is presented for scheduling in a flowshop to...
Sequencing picking operations and travel time models for man-on-board storage and retrieval warehousing system
1993,
Hwang H.
This paper deals with the order sequencing problem in a man-on-board storage and...
First Page
89
90
91
92
93
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers