Herroelen Willy S.

Willy S. Herroelen

Information about the author Willy S. Herroelen will soon be added to the site.
Found 11 papers in total
Note on the paper ‘Resource-constrained project management using enhanced theory of constraint’ by Wei et al
2003
In a recent paper Wei, Liu and Tsai (IAOR No. 82327) present an ‘advanced TOC...
Project network models with discounted cash flows: a guided tour through recent developments
1997
The vast majority of the project scheduling methodologies presented in the literature...
An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
1998
In this paper, we consider the resource-constrained project scheduling problem (RCPSP)...
dagen: A generator of testsets for project activity nets
1996
We offer a methodology, and the relevant software, to generate source–terminal...
On the use of the complexity index as a measure of complexity in activity networks
1996
A large number of optimal and suboptimal procedures have been developed for solving...
An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
1996
In this paper a branch-and-bound procedure is described for scheduling project...
New benchmark results for the resource-constrained project scheduling problem
1997
This paper reports on new insights derived from computational results obtained with an...
Optimal procedures for the discrete time/cost trade-off problem in project networks
1996
We describe two algorithms, based on dynamic programming logic, for optimally solving...
Modelling setup times, process batches and transfer batches using activity network logic
1996
The objective of this paper is to demonstrate how modelling ideas and solution...
Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects
1993
In a recent paper, an optimal procedure was presented for the resolution of the...
The scheduling of activities to maximize the net present value of projects
1990
The authors review and critique the approaches offered for the resolution of the...