Article ID: | iaor19961339 |
Country: | Netherlands |
Volume: | 65 |
Issue: | 2 |
Start Page Number: | 274 |
End Page Number: | 277 |
Publication Date: | Mar 1993 |
Journal: | European Journal of Operational Research |
Authors: | Herroelen Willy S., Gallens Els |
In a recent paper, an optimal procedure was presented for the resolution of the problem of maximizing the net present value of a project through the manipulation of the times of realization of its key events. The procedure has been programmed in C for personal computers running under the DOS operating system. In this note the authors report on the promising computational experience obtained with the algorithm on a problem set involving 250 randomly generated projects.