Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Jatinder N.D. Gupta
Information about the author Jatinder N.D. Gupta will soon be added to the site.
Found
46 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Single machine group scheduling with family setups to minimize total tardiness
2008
This paper considers the single machine scheduling problem with independent family...
Supply chain scheduling: Just-in-time environment
2008
We study the benefits of coordinated decision making in a supply chain consisting of a...
Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
2008
This paper presents various Tabu Search (TS) based meta-heuristics for scheduling the...
Single machine scheduling with time deteriorating job values
2008
This paper considers the problem of scheduling n jobs on a single machine where the...
Contemporary maintenance management: process, framework and supporting pillars
2006
This paper presents a holistic framework for managing the maintenance function...
Flowshop scheduling research after five decades
2006
Since Johnson's seminal paper in 1954, flowshop scheduling problems have received...
A review of traveling salesman problem based approaches for flowshop scheduling
2006
Contemporary flowshops that are variants of the classical flowshop frequently pose...
Performance guarantees for flowshop heuristics to minimize makespan
2006
This paper reviews the known worst-case ratios and absolute performance guarantees of...
Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs
2005
This paper considers the problem of generating a set of efficient (non-dominated)...
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
2005
This paper considers the problem of scheduling part families and jobs within each part...
Operational and financial effectiveness of e-collaboration tools in supply chain integration
2004
This paper develops a comprehensive model of supply chain integration and uses it to...
An empirical analysis of integer programming formulations for the permutation flowshop
2004
An empirical analysis was conducted to assess the relative effectiveness of four...
Two-machine flow shop scheduling with nonregular criteria
2004
We consider a two-machine flow shop problem with a common due date where the objective...
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
2004
This paper considers a variant of the classical problem of minimizing makespan in a...
Two-machine open shop scheduling with secondary criteria
2003
This paper considers two-machine open shop problems with secondary criteria where the...
Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time
2003
This paper considers the problems of scheduling jobs on parallel identical machines...
Maintenance policies for a production system with constrained production rate and buffer capacity
2003
This paper considers the maintenance policies for a production system constrained by...
Two-machine flowshop scheduling with a secondary criterion
2003
This paper develops mathematical programming formulations, a branch-and-bound...
Heuristics for hybrid flow shops with controllable processing times and assignable due dates
2002
This paper considers a generalization of the permutation flow shop problem that...
Solving hybrid flow shop problem using energetic reasoning and global operations
2001
This paper shows that the use of satisfiability tests and time-bound adjustments based...
Local search heuristics for two-stage flow shop problems with secondary criterion
2002
This paper develops and compares different local search heuristics for the two-stage...
Minimizing flowtime subject to optimal makespan on two identical parallel machines
2000
We consider the problem of scheduling jobs on two parallel identical machines where an...
The cutting stock problem with a given sequence of order lengths
1999
This paper considers the one-dimensional cutting stock problem where the demand for a...
Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs
1999
This paper develops a branch and bound algorithm for solving the single-machine...
1
2
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers