Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times

Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times

0.00 Avg rating0 Votes
Article ID: iaor2009256
Country: Netherlands
Volume: 111
Issue: 2
Start Page Number: 593
End Page Number: 605
Publication Date: Jan 2008
Journal: International Journal of Production Economics
Authors: , , , ,
Keywords: heuristics: tabu search
Abstract:

This paper presents various Tabu Search (TS) based meta-heuristics for scheduling the part families and jobs within each family in a flowline manufacturing cell (also called a flowshop) with sequence dependent family setup times to minimize makespan. Concepts of Elitism and the acceptance of worse moves from simulated annealing are examined in the proposed meta-heuristics to improve intensification and diversification. The effectiveness and efficiency of the proposed TS based meta-heuristics are compared against the best meta-heuristic and heuristic algorithms reported so far for this problem on several test problems.

Reviews

Required fields are marked *. Your email address will not be published.