| Article ID: | iaor2009256 |
| Country: | Netherlands |
| Volume: | 111 |
| Issue: | 2 |
| Start Page Number: | 593 |
| End Page Number: | 605 |
| Publication Date: | Jan 2008 |
| Journal: | International Journal of Production Economics |
| Authors: | Gupta Jatinder N.D., Mansouri S. Afshin, Hendizadeh S. Hamed, Faramarzi Hamidreza, ElMekkawy Tarek Y. |
| Keywords: | heuristics: tabu search |
This paper presents various Tabu Search (TS) based meta-heuristics for scheduling the part families and jobs within each family in a flowline manufacturing cell (also called a flowshop) with sequence dependent family setup times to minimize makespan. Concepts of Elitism and the acceptance of worse moves from simulated annealing are examined in the proposed meta-heuristics to improve intensification and diversification. The effectiveness and efficiency of the proposed TS based meta-heuristics are compared against the best meta-heuristic and heuristic algorithms reported so far for this problem on several test problems.