Wang Dingwei

Dingwei Wang

Information about the author Dingwei Wang will soon be added to the site.
Found 38 papers in total
Flow shop scheduling with fuzzy due dates using genetic algorithm
2000
This paper discusses flow shop scheduling from the viewpoint of fuzziness. We...
Single machine earliness–tardiness scheduling problem with additional penalties about due window
2000
Due date assignment and sequencing problem is one of the scheduling fields about due...
Scheduling grouped jobs on single machine with genetic algorithm
1999
Production scheduling of grouped jobs has been an active research area since Group...
JIT production planning approach with fuzzy due date for OKP manufacturing systems
1999
In general practice, most customers use a fuzzy due date rather than exact date when...
Simulation study of CONWIP for a cold rolling plant
1998
The CONWIP production control system has received a great deal of attention from...
A hybrid genetic algorithm for a type of nonlinear programming problem
1998
Based on the introduction of some new concepts of semifeasible direction, Feasible...
An inexact approach for linear programming problems with fuzzy objective and resources
1997
An inexact approach is proposed to solve objective/resource type of fuzzy linear...
A nonsymmetric model for fuzzy nonlinear programming problems with penalty coefficients
1997
In this paper, a nonsymmetric model for a type of fuzzy nonlinear programming problems...
An interactive approach based on a genetic algorithm for a type of quadratic programming problems with fuzzy objective and resources
1997
A type of model of fuzzy quadratic programming problems (FQP) is proposed. It...
A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm
1996
To closely describe the earliness/tardiness production planning problems in the JIT...
Common due-date determination and sequencing using Tabu Search
1996
Tabu Search techniques are adapted to a single-machine scheduling problem where a...
A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm
1996
To closely describe the earliness/tardiness production planning problems in the JIT...
Computation reduction for a large scale Markov process model to analyse multistage production systems
1992
In order to solve a large-scale Markov decision process which optimizes the control...
Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
1991
The strategies developed in part I of this paper are extended to a more general case...
Papers per page: