JIT production planning approach with fuzzy due date for OKP manufacturing systems

JIT production planning approach with fuzzy due date for OKP manufacturing systems

0.00 Avg rating0 Votes
Article ID: iaor20001467
Country: Netherlands
Volume: 58
Issue: 2
Start Page Number: 209
End Page Number: 215
Publication Date: Jan 1999
Journal: International Journal of Production Economics
Authors: , ,
Keywords: programming: linear
Abstract:

In general practice, most customers use a fuzzy due date rather than exact date when operating their one-of-a-kind product (OKP) manufacturing systems. They usually have different degrees of satisfaction with the due date. In order to clearly describe the practical problems, two kinds of models with different types of fuzzy due dates for OKP manufacturing systems are built to control production by the just-in-time (JIT) philosophy. In addition, we have developed an algorithm for JIT production planning with a fuzzy due date. The proposed method extends the traditional production planning approaches that have a precise nature to those with a case imprecise nature. The computational results have shown that the algorithm has the potential to be applied to practical OKP manufacturing systems.

Reviews

Required fields are marked *. Your email address will not be published.