Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Wieslaw Kubiak
Information about the author Wieslaw Kubiak will soon be added to the site.
Found
32 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Minimizing variation of production rates in just-in-time systems: A survey
1993
In the past several years, there has been growing interest in scheduling problems...
An efficient algorithm for a job shop problem
1995
The authors study the problem of minimizing makespan in a two-machine job shop with...
Optimal just-in-time schedules for flexible transfer lines
1994
Flexible transfer lines or mixed-model assembly lines are capable of diversified...
Completion time variance minimization on a single machine is difficult
1993
The complexity of the completion time variance minimization (CTV) problem on a single...
Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
1991
A compansion paper (Part I) considers the problem of minimizing the weighted earliness...
Proof of a conjecture of Schrage about the completion time variance problem
1991
The problem of minimizing the completion time variance of n jobs on a single machine...
A note on ‘Level schedules for mixed-model assembly lines in just-in-time production systems’
1991
This note formulates an assignment problem for obtaining optimal level schedules for...
A pseudo-polynomial algorithm for a two-machine no-wait job-shop scheduling problem
1989
An O( n 5 N) algorithm is proposed for the n- job problem 2/ n/J, no-wait, pt ji =1/C...
First Page
1
2
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers