A note on ‘Level schedules for mixed-model assembly lines in just-in-time production systems’

A note on ‘Level schedules for mixed-model assembly lines in just-in-time production systems’

0.00 Avg rating0 Votes
Article ID: iaor19911534
Country: United States
Volume: 37
Issue: 1
Start Page Number: 121
End Page Number: 122
Publication Date: Jan 1991
Journal: Management Science
Authors: ,
Keywords: scheduling, programming: nonlinear
Abstract:

This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg where, however, only enumerative algorithms and heuristics were proposed for its solution. The present assignment formulation can also be extended to more general objective functions than the one used by Miltenburg.

Reviews

Required fields are marked *. Your email address will not be published.