Insertion techniques for static and dynamic resource-constrained project scheduling

Insertion techniques for static and dynamic resource-constrained project scheduling

0.00 Avg rating0 Votes
Article ID: iaor20043038
Country: Netherlands
Volume: 149
Issue: 2
Start Page Number: 249
End Page Number: 267
Publication Date: Sep 2003
Journal: European Journal of Operational Research
Authors: , ,
Keywords: scheduling, heuristics
Abstract:

A flow network model is presented for the static resource-constrained project scheduling problem. Static and dynamic scheduling methods, based on a new polynomial insertion algorithm taking advantage on the flow structure, are proposed. The performed computational experiments on some state-of-the-art problem instances show the potential of this approach.