Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
M.N. Gopalan
Information about the author M.N. Gopalan will soon be added to the site.
Found
17 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Stochastic analysis of a two-stage production system with two parallel machines in the first stage and subject to inspection
2006
The paper deals with the stochastic analysis of a two-stage production system with two...
Busy period analysis of a two-stage multi-product system with interstage buffer
1999
This paper examines the transient behaviour of a two-stage multiproduct production...
On the utilization of a merge production system under problem ‚make-to-order’ policy-semi-regenerative modelling
1999
In this paper, a merge production system with two parallel stations in the first stage...
On the transient behaviour of a continuous review (s,S) inventory policy
1996
The transient behaviour of a continuous review ( s,S) inventory without backlogging is...
On the transient behaviour of an assembly-like production system
1996
An assembly-like production system which has two parallel stations in the first stage...
On the expected output of two-stage production systems with multi-type rework
1996
This paper deals with the transient analysis of a two-stage transfer-line production...
Analysis of a merge production system under make-to-order policy
1995
In this paper, a merge production system with two parallel stations in the first stage...
Probability of first passage analysis of a two-stage transfer-line production system with rework
1995
This paper provides an integrated framework to consider manufacturing, inspection and...
On the utilization of a split production system with inter-stage inspection
1995
In this paper, a split production system with two parallel stations in the second...
Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework
1994
This paper provides a complete framework to consider manufacturing, inspection and...
Multi-type rework in two-stage production systems with an initial storage-cost analysis
1994
This paper deals with the analysis of two-stage production systems with an initial...
On the transient behaviour of a merge production system with an end buffer
1994
In this paper, a merge production system which has two parallel stations in the first...
First passage analysis of a two-stage production system with rework
1994
This paper incorporates the concept of rework in the probabilistic analysis of...
On the utilization analysis of two-stage transfer line production system subject to inter-stage inspection and rework
1990
The purpose of this paper is to carry out the transient busy period analysis of a...
On the mean production-rate analysis of a two-stage production system with end buffer and random demand
1990
This paper deals with the transient fluctuations of the mean production rate of a...
Cost analysis of a one-unit non-repairable system subject to on-line preventive maintenance-IV
1989
A study of the cost analysis of a one-unit non-repairable system subject to on-line...
Cost benefit analysis of queues in tandem with buffer-II
1989
This paper deals with the cost benefit analysis of a system with two production...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers