Gopalan M.N.

M.N. Gopalan

Information about the author M.N. Gopalan will soon be added to the site.
Found 17 papers in total
Stochastic analysis of a two-stage production system with two parallel machines in the first stage and subject to inspection
2006
The paper deals with the stochastic analysis of a two-stage production system with two...
Busy period analysis of a two-stage multi-product system with interstage buffer
1999
This paper examines the transient behaviour of a two-stage multiproduct production...
On the utilization of a merge production system under problem ‚make-to-order’ policy-semi-regenerative modelling
1999
In this paper, a merge production system with two parallel stations in the first stage...
On the transient behaviour of a continuous review (s,S) inventory policy
1996
The transient behaviour of a continuous review ( s,S) inventory without backlogging is...
On the transient behaviour of an assembly-like production system
1996
An assembly-like production system which has two parallel stations in the first stage...
On the expected output of two-stage production systems with multi-type rework
1996
This paper deals with the transient analysis of a two-stage transfer-line production...
Analysis of a merge production system under make-to-order policy
1995
In this paper, a merge production system with two parallel stations in the first stage...
Probability of first passage analysis of a two-stage transfer-line production system with rework
1995
This paper provides an integrated framework to consider manufacturing, inspection and...
On the utilization of a split production system with inter-stage inspection
1995
In this paper, a split production system with two parallel stations in the second...
Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework
1994
This paper provides a complete framework to consider manufacturing, inspection and...
Multi-type rework in two-stage production systems with an initial storage-cost analysis
1994
This paper deals with the analysis of two-stage production systems with an initial...
On the transient behaviour of a merge production system with an end buffer
1994
In this paper, a merge production system which has two parallel stations in the first...
First passage analysis of a two-stage production system with rework
1994
This paper incorporates the concept of rework in the probabilistic analysis of...
On the utilization analysis of two-stage transfer line production system subject to inter-stage inspection and rework
1990
The purpose of this paper is to carry out the transient busy period analysis of a...
On the mean production-rate analysis of a two-stage production system with end buffer and random demand
1990
This paper deals with the transient fluctuations of the mean production rate of a...
Cost analysis of a one-unit non-repairable system subject to on-line preventive maintenance-IV
1989
A study of the cost analysis of a one-unit non-repairable system subject to on-line...
Cost benefit analysis of queues in tandem with buffer-II
1989
This paper deals with the cost benefit analysis of a system with two production...
Papers per page: