Waligra Grzegorz

Grzegorz Waligra

Information about the author Grzegorz Waligra will soon be added to the site.
Found 8 papers in total
Heuristic approaches to discrete‐continuous project scheduling problems to minimize the makespan
2011
In this paper some discrete‐continuous project scheduling problems to minimize...
Modelling and solving grid resource allocation problem with network resources for workflow applications
2011
A problem of allocating resources of a grid to workflow applications is considered....
Project scheduling with finite or infinite number of activity processing modes ‐ A survey
2011
This paper surveys single-project, single-objective, deterministic project scheduling...
Tabu list management methods for a discrete–continuous scheduling problem
2002
A problem of scheduling jobs on parallel, identical machines under an additional...
Simulated annealing for multi-mode resource-constrained project scheduling
2001
In this paper the resource-constrained project scheduling problem with multiple...
Discrete–continuous scheduling to minimize the makespan for power processing rates of jobs
1999
A class of discrete–continuous scheduling problems is considered when each...
Local search metaheuristics for discrete continuous scheduling problems
1998
Problems of scheduling nonpreemptable jobs which require simultaneously a machine from...
Papers per page: