Simulated annealing for multi-mode resource-constrained project scheduling

Simulated annealing for multi-mode resource-constrained project scheduling

0.00 Avg rating0 Votes
Article ID: iaor20021135
Country: Netherlands
Volume: 102
Issue: 1
Start Page Number: 137
End Page Number: 155
Publication Date: Feb 2001
Journal: Annals of Operations Research
Authors: , , , ,
Keywords: scheduling, optimization: simulated annealing
Abstract:

In this paper the resource-constrained project scheduling problem with multiple execution modes for each activity and the makespan as the minimization criterion is considered. A simulated annealing approach to solve this problem is presented. The feasible solution representation is based on a precedence feasible list of activities and a mode assignment. A comprehensive computational experiment is described, performed on a set of standard test problems constructed by the ProGen project generator. The results are analyzed and discussed and some final remarks are included.

Reviews

Required fields are marked *. Your email address will not be published.