Bard Jonathan F.

Jonathan F. Bard

Information about the author Jonathan F. Bard will soon be added to the site.
Found 50 papers in total
Staff scheduling at the United States Postal Service
2003
The purpose of this paper is to present a full-scale model of the tour scheduling...
Multiple fleet aircraft schedule recovery following hub closures
2001
This paper presents three multi-commodity network-type models for determining a...
A bilevel programming approach to determining tax credits for biofuel production
2000
This paper presents a bilevel programming formulation of a leader–follower game...
An optimization approach to capacity expansion in semiconductor manufacturing facilities
1999
For a given demand and planning horizon, the general facility design problem faced by...
Heuristics for the flow line problem with setup costs
1998
This paper presents two new heuristics for the flowshop scheduling problem with...
Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups
1998
This paper presents a branch-and-cut (B&C) algorithm for the problem of minimizing...
A GRASP for the vehicle routing problem with time windows
1995
This paper addresses the problem of finding the minimum number of vehicles required to...
Facility-wide planning and scheduling of printed wiring board assembly
1995
In the last decade, the US electronics industry has experienced a 10% annual...
Complexity results for mixed-model assembly lines with approximation algorithms for the single station case
1997
Mixed-model assembly lines are becoming increasingly interesting as the use of...
Facility-wide planning and scheduling of printed wiring board assembly
1995
In the last decade, the U.S. electronics industry has experienced a 10% annual...
A heuristic for machine scheduling at general mail facilities
1992
In most major population centers mail collected during the day and mail arriving from...
Equipment selection and machine scheduling in general mail facilities
1994
With the goal of fiscal self-sufficiency, the United States Postal Service has...
Solving large-scale tour scheduling problems
1994
For a given planning horizon, workforce composition and set of labor requirements,...
Machine setup and component placement in printed circuit board assembly
1994
Populating printed circuit boards is one of the most costly and time-consuming steps...
A simulation analysis of advanced concepts for semi-automated mail processing
1991
Over the last decade, much attention has been given to the development of automated...
An algorithm for the discrete bilevel programming problem
1992
The bilevel programming problem (BLPP) is an example of a two-stage, non-cooperative...
An analytic framework for sequencing mixed model assembly lines
1992
The problem of sequencing mixed model assembly lines is characterized by a set of...
A GRASP for a difficult single machine scheduling problem
1991
A greedy randomized adaptive search procedure (GRASP) is presented for an unusually...
An algorithm for the mixed-integer nonlinear bilevel programming problem
1992
The bilevel programming problem (BLPP) is a two-person nonzero sum game in which play...
Designing telecommunications networks for the reseller market
1991
This paper presents an algorithm for minimizing the monthly cost of telecommunications...
Arc reduction and path preference in stochastic acyclic networks
1991
The paper presents a heuristic for determining the path that maximizes the expected...
Flight scheduling and maintenance base planning
1989
In an effort to control costs, airlines have begun to concentrate on their maintenance...
The mixed integer linear bilevel programming problem
1990
A two-person, noncooperative game in which the players move in sequence can be modeled...
Using multicriteria methods in the early stages of new product development
1990
The R&D manager is commonly faced with the problem of deciding which projects to...
Papers per page: