Two-machine flow shop scheduling of polyurethane foam production

Two-machine flow shop scheduling of polyurethane foam production

0.00 Avg rating0 Votes
Article ID: iaor20127992
Volume: 141
Issue: 1
Start Page Number: 286
End Page Number: 294
Publication Date: Jan 2013
Journal: International Journal of Production Economics
Authors: , ,
Keywords: scheduling, combinatorial optimization, heuristics
Abstract:

This paper studies a two‐machine flow shop scheduling problem with a supporting precedence relation. The model originates from a real production context of a chemical factory that produces foam‐rubber products. We extend the traditional two‐machine flow shop by dividing the operations into two categories: supporting tasks and regular jobs. In the model, several different compositions of foam rubber can be mixed at the foam blooming stage, and products are processed at the manufacturing stage. Each job (product) on the second machine cannot start until its supporting tasks (parts) on the first machine are all finished and the second machine is not occupied. The objective is to find a schedule that minimizes the total job completion time. The studied problem is strongly NP‐hard. In this paper, we propose a branch‐and‐bound algorithm incorporating a lower bound and two dominance rules. We also design a simple heuristic and an iterated local search (ILS) algorithm to derive approximate solutions. The performances of the proposed algorithms are examined through computational experiments.

Reviews

Required fields are marked *. Your email address will not be published.