Fang K -T

K -T Fang

Information about the author K -T Fang will soon be added to the site.
Found 1 papers in total
Two-machine flow shop scheduling of polyurethane foam production
2013
This paper studies a two‐machine flow shop scheduling problem with a supporting...
Papers per page: