A possibilistic linear programming model for supply chain network design under uncertainty

A possibilistic linear programming model for supply chain network design under uncertainty

0.00 Avg rating0 Votes
Article ID: iaor20132502
Volume: 24
Issue: 2
Start Page Number: 209
End Page Number: 229
Publication Date: Apr 2013
Journal: IMA Journal of Management Mathematics
Authors: , , , ,
Keywords: programming: linear, combinatorial optimization
Abstract:

In this paper, we develop a possibilistic linear programming model for supply chain network design with imprecise inputs: market demands, supplied quantities, transportation costs, opening costs, treatment and storage costs are modelled as fuzzy numbers. An efficient possibilistic linear programme is constructed with fuzzy objective function that minimizes the sum of investment costs and operating costs of the supply chain. A method for solving the programming problem with fuzzy parameters is proposed. Application to a supply chain problem at a European textile company illustrates our methodology. Numerical results show that the performance of the proposed model in handling data uncertainty is better when compared to a classical deterministic model.

Reviews

Required fields are marked *. Your email address will not be published.