The delay‐time modelling of preventive maintenance of plant given limited PM data and selective repair at PM

The delay‐time modelling of preventive maintenance of plant given limited PM data and selective repair at PM

0.00 Avg rating0 Votes
Article ID: iaor20131806
Volume: 9
Issue: 4
Start Page Number: 355
End Page Number: 379
Publication Date: Oct 1998
Journal: IMA Journal of Management Mathematics
Authors: , , ,
Keywords: simulation, maintenance, repair & replacement, combinatorial optimization, inspection
Abstract:

This paper presents a maintenance‐modelling case study of a plant manufacturing brake linings. A delay‐time model is developed and applied to model and optimize preventive maintenance (PM). A key subsystem in the plant is used to illustrate the modelling process and management reaction. Defects identified at PM may not all be removed. This incomplete response to PM is a feature which has not been modelled before. The parameter values of the delay‐time process are estimated from objective data from maintenance records of failures, using the method of maximum likelihood. This is aided by a theorem extending results on the NHPP arival rate of failures in a perfect‐inspection case to the non‐perfect‐inspection case. Problems of parameter estimation given inadequate data collected at PMs are discussed, and the necessity to augment objective data with subjective assessments highlighted. Based upon the estimated model parameters and delay‐time distribution, an inspection model is constructed to describe the relationship between the total unit downtime and the PM interval. The response of management is discussed.