Tokyo has historically suffered from a shortage of final disposal sites for the treated sewage sludge. Given this situation, sludge recycling and incineration have been promoted to reduce the volume of treated sludge conveyed to the disposal site, and the recycling options have changed since the late 1990s. This study aims to revisit the sewage sludge treatment and recycling processes in Tokyo and to evaluate different recycling options (brick, aggregate, refuse derived fuel and slag) from the energy consumption perspective by clarifying the complex flow of treated sludge within Tokyo’s 23 wards. The study also estimates environmental loads associated with the operation of the whole sludge management system in the area. The environmental loads include: (1) total energy consumption and (2) gas emissions (greenhouse and acidification gases). The estimation was carried out for the years 1995, 1997, 1999 and 2001, during which a drastic change in recycling options occured. The results indicated that the production of refuse derived fuel was the most energy consuming recycling option while aggregate production is the least energy consuming. They also showed that despite the increasing sludge volume, the energy consumption associated with the operation of the whole system decreased during the period while the gas emissions increased.