A theory of optimized resource allocation from systems perspectives

A theory of optimized resource allocation from systems perspectives

0.00 Avg rating0 Votes
Article ID: iaor200970678
Country: United Kingdom
Volume: 26
Issue: 2
Start Page Number: 289
End Page Number: 296
Publication Date: Mar 2009
Journal: Systems Research and Behavioural Science
Authors: ,
Keywords: allocation: resources
Abstract:

A construction project is an example of a complex systems engineering problem. In this paper, we have characterized a construction project in the context of the theory of six forces on the factors of production. This new approach was defined by giving consideration to the characteristics of the construction project's resource allocation. An economic efficiency index was also used to assess resource allocation of a construction project. Based on this approach, a theory of optimized resource allocation of the construction project is proposed.

Reviews

Required fields are marked *. Your email address will not be published.