Economic production run length and warranty period for product with Weibull lifetime

Economic production run length and warranty period for product with Weibull lifetime

0.00 Avg rating0 Votes
Article ID: iaor200962763
Country: Singapore
Volume: 25
Issue: 6
Start Page Number: 753
End Page Number: 764
Publication Date: Dec 2008
Journal: Asia-Pacific Journal of Operational Research
Authors:
Keywords: quality & reliability
Abstract:

Traditional economic manufacturing quantity (EMQ) model addressed the perfect production for product. However, there possibly exists the defective product in the production process. In this paper, we present a modified EMQ model with shortage based on considering the product revenue and the inventory cost. The economic production run length, the maximum shortage level, and the optimal warranty period are simultaneously determined for obtaining the maximum expected total profit per year. The numerical example and the sensitivity analysis are further provided for illustration.

Reviews

Required fields are marked *. Your email address will not be published.