Design-Operation of Multi-Hydropower Reservoirs: HBMO (honey-bee mating optimization) Approach

Design-Operation of Multi-Hydropower Reservoirs: HBMO (honey-bee mating optimization) Approach

0.00 Avg rating0 Votes
Article ID: iaor20097233
Country: Netherlands
Volume: 22
Issue: 12
Start Page Number: 1709
End Page Number: 1722
Publication Date: Dec 2008
Journal: Water Resources Management
Authors: , ,
Keywords: energy
Abstract:

To illustrate and test the applicability and performance of the innovative honey–bee mating optimization (HBMO) algorithm in highly non–convex hydropower system design and operation, two problems are considered: single reservoir and multi–reservoir. Both hydropower problems are formulated to minimize the total present net cost of the system, while achieving the maximum possible ratio for generated power to installed capacity. The single hydropower reservoir problem is approached by the developed algorithm in 10 different runs. The first feasible solution was generated initially and later improved significantly and solutions converged to a near optimal solution very rapidly. In the application of the proposed algorithm to a five–reservoir hydropower system with 48 periods and a total of 230 decision variables, in early mating flights, the first feasible solution was identified and the results converged to a near optimal solution in later mating flights. In the case of the multi–reservoir problem, an efficient gradient–based nonlinear–programming solver (LINGO 8.0) failed to find a feasible solution and for the single hydropower reservoir design problem it performed much worse than the proposed algorithm.

Reviews

Required fields are marked *. Your email address will not be published.