Integrating production–transportation planning decision with fuzzy multiple goals in supply chains

Integrating production–transportation planning decision with fuzzy multiple goals in supply chains

0.00 Avg rating0 Votes
Article ID: iaor20091043
Country: United Kingdom
Volume: 46
Issue: 6
Start Page Number: 1477
End Page Number: 1494
Publication Date: Jan 2008
Journal: International Journal of Production Research
Authors:
Keywords: fuzzy sets, programming: multiple criteria
Abstract:

This work presents a novel fuzzy multi-objective linear programming (f-MOLP) model for solving integrated production–transportation planning decision (PTPD) problems in supply chains in a fuzzy environment. The proposed model attempts to simultaneously minimise total production and transportation costs, total number of rejected items, and total delivery time with reference to available capacities, labor level, quota flexibility, and budget constraints at each source, as well as forecast demand and warehouse space at each destination. An industrial case demonstrates that the proposed f-MOLP model achieves an efficient compromise solution and overall decision maker satisfaction with determined goal values. Additionally, the proposed model provides a systematic framework that facilitates decision makers to interactively modify the fuzzy data and parameters until a satisfactory solution is obtained. Overall, the f-MOLP model offers a practical method for solving PTPD problems with fuzzy multiple goals, and can effectively improve producer–distributor relationships within a supply chain.

Reviews

Required fields are marked *. Your email address will not be published.