Quay crane scheduling with handling priority in port container terminals

Quay crane scheduling with handling priority in port container terminals

0.00 Avg rating0 Votes
Article ID: iaor2009517
Country: United Kingdom
Volume: 40
Issue: 2
Start Page Number: 179
End Page Number: 189
Publication Date: Feb 2008
Journal: Engineering Optimization
Authors: , ,
Keywords: scheduling, heuristics: genetic algorithms, programming: integer
Abstract:

The quay crane scheduling problem studied in this article is to determine a handling sequence of ship bays for quay cranes assigned to a container ship considering handling priority of every ship bay. This article provides a mixed integer programming model for the considered problem. A genetic algorithm is proposed to obtain near-optimal solutions. Computational experiments to examine the proposed model and solution algorithm are described.

Reviews

Required fields are marked *. Your email address will not be published.