Scheduling parallel CNC machines with time/cost trade-off considerations

Scheduling parallel CNC machines with time/cost trade-off considerations

0.00 Avg rating0 Votes
Article ID: iaor20083028
Country: United Kingdom
Volume: 34
Issue: 9
Start Page Number: 2774
End Page Number: 2789
Publication Date: Sep 2007
Journal: Computers and Operations Research
Authors: ,
Keywords: heuristics
Abstract:

When the processing times of jobs are controllable, selected processing times affect both the manufacturing cost and the scheduling performance. A well-known example for such a case that this paper specifically deals with is the turning operation on a CNC machine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. We also know that scheduling decisions are quite sensitive to the processing times. Therefore, this paper considers minimizing total manufacturing cost (F1) and total completion time (F2) objectives simultaneously on identical parallel CNC turning machines. Since decreasing processing time of a job increases its manufacturing cost, we cannot minimize both objectives at the same time, so the problem is to generate non-dominated solutions. We consider the problem of minimizing F1 subject to a given F2 level and give an effective formulation for the problem. For this problem, we prove some optimality properties which facilitated designing an efficient heuristic algorithm to generate approximate non-dominated solutions. Computational results show that proposed algorithm performs almost equal with the GAMS/MINOS commercial solver although it spends much less computation time.

Reviews

Required fields are marked *. Your email address will not be published.