A multi-objective two-stage approach to the design of communication networks subject to production constraints for computerized manufacturing systems

A multi-objective two-stage approach to the design of communication networks subject to production constraints for computerized manufacturing systems

0.00 Avg rating0 Votes
Article ID: iaor1988556
Country: United Kingdom
Volume: 27
Issue: 4
Start Page Number: 587
End Page Number: 598
Publication Date: Apr 1989
Journal: International Journal of Production Research
Authors: ,
Keywords: manufacturing industries, programming: multiple criteria, design
Abstract:

A two stage model for joint optimization of production volume and communication system cost for a multi-product manufacturing system has been developed. Stage I minimizes penalty cost, which includes cost due to under-achievement of production targets and over-fulfilment of production capacities, and determines the optimal production volumes in order to achieve the desired production plan with the available physical capacities at various stations. Stage II determines optimal design parameters for communication systems while minimizing the total penalty cost and achieving the near-optimal production volumes of stage I. A case example is discussed thereafter which illustrates the importance of joint optimization of resources as against independent optimization.

Reviews

Required fields are marked *. Your email address will not be published.