Analysis of standard ordering policies within the framework of MRP theory

Analysis of standard ordering policies within the framework of MRP theory

0.00 Avg rating0 Votes
Article ID: iaor20071705
Country: United Kingdom
Volume: 44
Issue: 18/19
Start Page Number: 3759
End Page Number: 3773
Publication Date: Jan 2006
Journal: International Journal of Production Research
Authors: ,
Keywords: inventory: order policies
Abstract:

A number of different standard ordering policies are presented within the methodology of Material Requirements Planning (MRP), such as Lot-For-Lot (L4L), Fixed Order Quantity (FOQ), Fixed Period Requirements (FPR), etc. In MRP theory the time development of the production–inventory system is determined by a set of fundamental equations for available inventory, total inventory and backlogs using Input–Output Analysis for capturing the Bill of Materials and Laplace transforms for describing the advanced timing requirements. This paper aims at formally introducing standard ordering policies into the fundamental equations of MRP Theory in order to analyse the possibility to obtain closed-form expressions for the time development of the system, when such rules are applied.

Reviews

Required fields are marked *. Your email address will not be published.