Optimal lot sizing in an unreliable two-stage serial production–inventory system

Optimal lot sizing in an unreliable two-stage serial production–inventory system

0.00 Avg rating0 Votes
Article ID: iaor20071583
Country: United Kingdom
Volume: 12
Issue: 1
Start Page Number: 63
End Page Number: 82
Publication Date: Jan 2005
Journal: International Transactions in Operational Research
Authors: , ,
Keywords: lot sizing
Abstract:

This paper deals with a two-stage lot sizing problem in an unreliable production environment in which the machine at the first stage (stage 1) is failure-prone while the machine at the final stage (stage 2) is failure-free. The process goods are obtained in batches by manufacturing and are transferred continuously from stage 1 to stage 2 where the finished goods are produced and then shipped out to customers. If the machine at stage 1 breaks down then the production of the interrupted lot is not resumed. Instead, a new production cycle is initiated after machine repair. The model is formulated assuming that the production rate of the machine at stage 1 is greater than that at stage 2 and the time to machine failure and repair time are arbitrarily distributed. Specific formulation of the model under exponential failure and exponential repair time distributions is derived and a procedure for finding the optimal production policy is presented. The dependence of the optimal production policy on the model parameters is also examined with numerical examples.

Reviews

Required fields are marked *. Your email address will not be published.