Article ID: | iaor2007142 |
Country: | United Kingdom |
Volume: | 50 |
Issue: | 1/2 |
Start Page Number: | 185 |
End Page Number: | 194 |
Publication Date: | May 2006 |
Journal: | Computers & Industrial Engineering |
Authors: | Yildirim Mehmet Bayram, Cakar Tarik, Doguc Ufuk, Meza Jose Ceciliano |
Keywords: | neural networks, production: FMS |
When there is a production system with excess capacity, i.e. more capacity than the demand for the foreseeable future, upper management might consider utilizing only a portion of the available capacity by decreasing the number of workers or halting production on some of the machines/production lines, etc. while preserving the flexibility of the production system to satisfy demand spikes. To achieve this flexibility, upper management might be willing to attain some pre-determined/desired performance values in a production system having identical parallel machines in each work center. In this study, we propose a framework that utilizes parallel neural networks to make decisions on the availability of resources, due date assignments for incoming orders, and dispatching rules for scheduling. This framework is applied to a flexible manufacturing system with work centers having parallel identical machines. The artificial neural networks were able to satisfactorily capture the underlying relationship between the design and control parameters of a manufacturing system and the resulting performance targets.