Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks

Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks

0.00 Avg rating0 Votes
Article ID: iaor2007142
Country: United Kingdom
Volume: 50
Issue: 1/2
Start Page Number: 185
End Page Number: 194
Publication Date: May 2006
Journal: Computers & Industrial Engineering
Authors: , , ,
Keywords: neural networks, production: FMS
Abstract:

When there is a production system with excess capacity, i.e. more capacity than the demand for the foreseeable future, upper management might consider utilizing only a portion of the available capacity by decreasing the number of workers or halting production on some of the machines/production lines, etc. while preserving the flexibility of the production system to satisfy demand spikes. To achieve this flexibility, upper management might be willing to attain some pre-determined/desired performance values in a production system having identical parallel machines in each work center. In this study, we propose a framework that utilizes parallel neural networks to make decisions on the availability of resources, due date assignments for incoming orders, and dispatching rules for scheduling. This framework is applied to a flexible manufacturing system with work centers having parallel identical machines. The artificial neural networks were able to satisfactorily capture the underlying relationship between the design and control parameters of a manufacturing system and the resulting performance targets.

Reviews

Required fields are marked *. Your email address will not be published.