Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time

Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time

0.00 Avg rating0 Votes
Article ID: iaor20063339
Country: United States
Volume: 11
Issue: 2
Publication Date: Jun 2004
Journal: International Journal of Industrial Engineering
Authors: ,
Keywords: heuristics
Abstract:

The three-machine no-wait flowshop problem is addressed to minimize total completion time where setup and removal times of the jobs are considered as separate from processing times. Several heuristics are developed and computationally tested for effectiveness. Results of extensive computational experiments on randomly generated data show that the proposed heuristics perform quite well.