Tariq Aldowaisan
Information about the author Tariq Aldowaisan will soon be added to the site.
Found
8 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Two-machine flowshop scheduling to minimize total completion time with separate setup and removal times
2002
This paper addresses the two-machine flowshop problem with respect to the total...
Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time
2004
The three-machine no-wait flowshop problem is addressed to minimize total completion...
No-wait flowshops with bicriteria of makespan and maximum lateness
2004
We address the m -machine no-wait flowshop scheduling problem with a weighted sum of...
New heuristics for m-machine no-wait flowshop to minimize total completion time
2004
This paper presents several new heuristics for the m -machines no-wait flowshop with...
New heuristics for no-wait flowshops to minimize makespan
2003
This paper addresses the m machine no-wait flowshop scheduling problem to minimize...
New heuristics to minimize total completion time in m-machine flowshops
2002
We consider the m -machine permutation flowshop with the objective of minimizing total...
No-wait and separate setup three-machine flowshop with total completion time criterion
2000
This paper considers the three-machine no-wait flowshop problem with the objective of...
Total flowtime in no-wait flowshops with separated setup times
1998
This paper addresses the two-machine no-wait flowshop problem where the setup time of...