Article ID: | iaor20061298 |
Country: | United Kingdom |
Volume: | 105 |
Issue: | 2 |
Start Page Number: | 193 |
End Page Number: | 207 |
Publication Date: | Feb 2005 |
Journal: | Industrial Management & Data Systems |
Authors: | Caputo Antonio C., Palumbo Mario |
Keywords: | economics |
Purpose – This article aims to suggest to managers involved in re-engineering projects a method to assess the feasibility of manufacturing re-insourcing. Design/methodology/approach – At first, an analysis of the textile sector is carried out. Subsequently, a methodology is described, able to assess the feasibility of manufacturing re-insourcing. As a case study, a high production shop is then proposed and sized for the quick reponse requirements of a company producing young apparel lines on behalf of third parties. Finally, an economic evaluation is carried out in order to assess the profitability of the re-insourcing strategy. Findings – A methodology which can aid managers to assess the feasibility of manufacturing re-insourcing in re-engineering programs is proposed. Originality/value – The proposed methodology is original.