Article ID: | iaor20061237 |
Country: | United Kingdom |
Volume: | 21 |
Issue: | 2 |
Start Page Number: | 93 |
End Page Number: | 103 |
Publication Date: | Feb 2006 |
Journal: | Computer-Aided Civil and Infrastructure Engineering |
Authors: | Zhang Hong, Li Heng, Tam C.M. |
Keywords: | heuristics |
The multimode resource-constrained project scheduling problem (MRSPSP) considers both renewable and nonrenewable resources that have not been addressed efficiently in the construction field. This article introduces a methodology for solving the MRCPSP based on particle swarm optimization (PSO) that has not been utilized for this and other construction-related problems. The framework of the PSO-based methodology is developed. A particle representation formulation is proposed to represent the potential solution to the MRCPSP in terms of priority combination and mode combination for activities. Each particle-represented solution should be checked against the nonrenewable resource infeasibility and will be handled by adjusting the mode combination. The feasible particle-represented solution is transformed to a schedule through a serial generation scheme. Experimental analyses are presented to investigate the performance of the proposed methodology.