| Article ID: | iaor20051384 |
| Country: | United Kingdom |
| Volume: | 11 |
| Issue: | 3 |
| Start Page Number: | 243 |
| End Page Number: | 257 |
| Publication Date: | May 2004 |
| Journal: | International Transactions in Operational Research |
| Authors: | Albornoz Vctor M., Benario Pablo, Rojas Manuel E. |
| Keywords: | programming: integer |
In this paper the obtaining of an optimum policy in the capacity expansion planning of a particular thermal-electric power system is proposed. Therefore, a two-stage stochastic integer programming is formulated. The model includes, through a finite group of scenarios, the existent uncertainty related to the future availability of the thermal plants currently under operation. The resultant model is solved numerically by the application of the L-shaped method, whose implementation and development were executed using the software AMPL, with CPLEX as a solver. The results reached are shown, which validate the use of the methodology adopted in this work.