A case study of single shift planning and scheduling under annualized hours: A simple three-step approach

A case study of single shift planning and scheduling under annualized hours: A simple three-step approach

0.00 Avg rating0 Votes
Article ID: iaor20051359
Country: Netherlands
Volume: 153
Issue: 1
Start Page Number: 148
End Page Number: 175
Publication Date: Feb 2004
Journal: European Journal of Operational Research
Authors: ,
Keywords: personnel & manpower planning, heuristics
Abstract:

In the current economic and industrial conditions, with demand ever fluctuating, designing a timetable to define a work schedule for each employee is not an easy task. Moreover due to legal and cost constraints, it is not always possible to engage and dismiss the employees according to the production requirement. In this paper, a three-step method is presented assigning the daily work for full-time employees working on one shift. It takes into account a set of legal constraints (such as holiday arrangements) and it guarantees that the defined workforce is minimal, assuming that employees are able to perform their tasks.

Reviews

Required fields are marked *. Your email address will not be published.