A new integrated system for loading and scheduling in cellular manufacturing

A new integrated system for loading and scheduling in cellular manufacturing

0.00 Avg rating0 Votes
Article ID: iaor2005650
Country: United Kingdom
Volume: 15
Issue: 1
Start Page Number: 37
End Page Number: 49
Publication Date: Jan 2002
Journal: International Journal of Computer Integrated Manufacturing
Authors: , ,
Keywords: programming: goal
Abstract:

In this paper, a multiple objective optimization technique, based on simulation, and a tabu search algorithm are proposed for loading and scheduling Cellular Manufacturing systems. Machine independent capability units known as Resource Elements are used to define the processing capabilities of machines and the processing requirements of parts. The loading problem is formally represented by a Goal Programming formulation with the objectives of system performance measures that are obtained by a simulation-based scheduling system. The problem is solved by a tabu search based algorithm. The proposed integrated system is implemented in C/C++ programming language and simulation. A practical case study is also explained and reported in detail.

Reviews

Required fields are marked *. Your email address will not be published.