Multiobjective dynamic scheduling using discrete event simulation

Multiobjective dynamic scheduling using discrete event simulation

0.00 Avg rating0 Votes
Article ID: iaor20043600
Country: United Kingdom
Volume: 14
Issue: 2
Start Page Number: 154
End Page Number: 167
Publication Date: Mar 2001
Journal: International Journal of Computer Integrated Manufacturing
Authors:
Keywords: simulation: applications
Abstract:

A discrete event simulation-based ‘on-line near-real-time’ dynamic multiobjective scheduling system has been conceptualized, designed, and developed to achieve Pareto optimal solutions in a complex manufacturing environment. Our approach includes the use of a linear optimization algorithm with multiple objectives and auto simulation model generation. Manufacturing is one of the most complex elements of the supply chain and we focus on manufacturing to demonstrate the capability that may be extended in future to the entire supply chain. We have implemented the system at a semiconductor back-end site to test our solutions. The impact of the system includes the achievement of world class cycle time, improved machine utilization, reduction in the time that planners and manufacturing personnel spend on scheduling, and more predictable and highly repeatable manufacturing performance. In addition, it enables managers and senior planners to carry out ‘what if’ analysis to plan for the future.

Reviews

Required fields are marked *. Your email address will not be published.