Article ID: | iaor20042012 |
Country: | United Kingdom |
Volume: | 41 |
Issue: | 17 |
Start Page Number: | 4211 |
End Page Number: | 4231 |
Publication Date: | Jan 2003 |
Journal: | International Journal of Production Research |
Authors: | Sabuncuolu Ihsan, Kizilisik Omer Batuhan |
Keywords: | scheduling, simulation: applications |
In this paper, we study the reactive scheduling problems in a dynamic and stochastic manufacturing environment. Specifically, we develop a simulation-based scheduling system for flexible manufacturing systems. We also propose several reactive scheduling policies (i.e. when-to-schedule and how-to-schedule policies) and test their performances under various experimental conditions, processing time variations, and machine breakdowns. Moreover, we compare offline and online scheduling schemes in a dynamic manufacturing environment. The results of extensive simulation experiments indicate that the variable-time-response is better than the fixed-time-response. The full scheduling scheme generally performs better than the partial scheduling. Finally, the online scheduling is more robust to uncertainty and variations in processing times than the optimum-seeking offline scheduling. A comprehensive bibliography is also provided in the paper.