Article ID: | iaor20041414 |
Country: | United Kingdom |
Volume: | 10 |
Issue: | 1 |
Start Page Number: | 77 |
End Page Number: | 87 |
Publication Date: | Jan 2003 |
Journal: | International Transactions in Operational Research |
Authors: | Ferland J.A., Clroux R., Paciornik N. |
Keywords: | energy, networks |
In this paper we are dealing with the electrical distribution network planning problem where a network configuration has to be specified in order to meet demand, to satisfy the operating constraints, and to minimize investment, operating, and power-loss costs. The interative procedure includes several heuristic algorithms to generate a radical network, to choose a set of open feeders to meet the reliability constraint, and to solve the reconfiguration problem in order to reduce the power-loss costs. Furthermore, in order to compare the reliability of potential solutions, a predictive reliability assessment measure is established.