| Article ID: | iaor2004132 |
| Country: | United Kingdom |
| Volume: | 12 |
| Issue: | 5 |
| Start Page Number: | 378 |
| End Page Number: | 385 |
| Publication Date: | Sep 1999 |
| Journal: | Logistics Information Management |
| Authors: | Plenert Gerhard |
| Keywords: | scheduling |
Takes the development of a new optimization process for production scheduling and develops it into a systematic-mathematical algorithm. Tests this algorithm against a simulated production environment and compares the generated schedules against those generated by economic order quantity, materials requirement planning, just-in-time and optimized production technology. The result is that bottleneck allocation methodology, with its critical resource based capacity scheduling, out-performs these other models in an intermittent demand discrete manufacturing environment.