| Article ID: | iaor20033133 |
| Country: | United Kingdom |
| Volume: | 30 |
| Issue: | 6 |
| Start Page Number: | 811 |
| End Page Number: | 819 |
| Publication Date: | May 2003 |
| Journal: | Computers and Operations Research |
| Authors: | Zhou Zhili, Li Ling |
| Keywords: | production, programming: integer |
A hoist controlled by a computer is widely used for moving electroplates which are chemically treated in a sequence of tanks. The hoist scheduling directly affects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a specific material handling issue, in a manufacturing environment. The scope of the study is in the area of single hoist cyclic scheduling with multiple tanks. The purpose of the study is to develop a mixed integer linear programming model that can be used to schedule multiple tanks and improve throughput in a process industry. Specifically, a method has been proposed to estimate the processing time in a bottleneck stage with multiple tanks.