Article ID: | iaor20032763 |
Country: | United Kingdom |
Volume: | 15 |
Issue: | 2 |
Start Page Number: | 88 |
End Page Number: | 104 |
Publication Date: | Jan 2002 |
Journal: | Logistics Information Management |
Authors: | Jaafari Ali, Doloi Hemanta |
Keywords: | simulation: applications |
This paper focuses on a conceptual methodology for an integrated simulation model dubbed as dynamic simulation modelling system (DSMS) for proactive and optimal decision making within a project management framework. Due to the uncertainties in project environment, the technical and operational functionality of a facility needs to be assessed during development and operation phases of the project. The simulation model is used for optimising the investment decisions vis-à-vis evaluation of functionalities on project facilities in early stages of the project. Project life cycle objective functions (LCOFs) are employed as a set of decision criteria throughout the project's life. The discussion is being extended on the need for setting up an integrated and user-friendly model to encompass the processes in the entire life cycle of the project. Details of the system are described and a hypothetical case study is used to demonstrate its capabilities. Possible extensions are then outlined. The C++ programming language in association with the object-oriented database management system is used to achieve the aforementioned objectives.