Generalized newsboy model to compute the optimal planned lead times in assembly systems

Generalized newsboy model to compute the optimal planned lead times in assembly systems

0.00 Avg rating0 Votes
Article ID: iaor20032734
Country: United Kingdom
Volume: 40
Issue: 17
Start Page Number: 4401
End Page Number: 4414
Publication Date: Jan 2002
Journal: IJPS
Authors: ,
Keywords: newsboy problem
Abstract:

Assembly systems with one type of finished product and several types of components are studied. The lead times of components are random variables, and the finished product demand is constant. The criterion considered is the sum of the average holding cost for the components and the average backlogging cost for the finished product. The decision variables are the planned lead times of components. A model that gives the optimal values for the planned lead times is proposed. From a practical point of view, this model can be used to calculate the safety lead time on assembly systems under supply uncertainty, and from a theoretical point of view, it is a generalization of the well-known discrete newsboy model.

Reviews

Required fields are marked *. Your email address will not be published.