Article ID: | iaor20022298 |
Country: | United Kingdom |
Volume: | 29 |
Issue: | 4 |
Start Page Number: | 335 |
End Page Number: | 342 |
Publication Date: | Aug 2001 |
Journal: | OMEGA |
Authors: | Chakravorty Satya S. |
Keywords: | production |
This study is an evaluation of the drum–buffer–rope (DBR) control mechanism compared to the modified infinite loading (MIL) control mechanism in a job shop environment. Although previous research has shown that the MIL mechanism works well in this environment, this study finds that the DBR control mechanism performs significantly better. The performance of the DBR mechanism improves when the shortest processing time dispatching rule is used.