Heuristic scheduling of parallel machines with sequence-dependent set-up times

Heuristic scheduling of parallel machines with sequence-dependent set-up times

0.00 Avg rating0 Votes
Article ID: iaor20022289
Country: United Kingdom
Volume: 39
Issue: 16
Start Page Number: 3747
End Page Number: 3769
Publication Date: Jan 2001
Journal: International Journal of Production Research
Authors: ,
Abstract:

In many manufacturing environments, multiple processing stations are used in parallel to obtain adequate capacity. Likewise, in many production environments, set-up activities are required for switching between items. This work addresses scheduling in parallel machines with sequence dependent set-up times and possibly non-zero ready times with the goal of minimizing makespan. Non-zero ready times allow for application in a continuous planning environment and will also support the expansion of the current model to a multistage production environment. An integer programming formulation is presented. Several heuristics, including approaches based on MULTI-FIT, genetic algorithms and the traveling salesman problem, are then developed and compared empirically. Seven factors are identified in order to generate problem data, including the number of parallel machines, the average number of jobs per machine, set-up time distribution parameters and processing time distribution parameters. The set-up time matrix can be either symmetric or asymmetric but must satisfy the triangle inequality. A modified insertion heuristic is found to perform best for these types of problems.

Reviews

Required fields are marked *. Your email address will not be published.