Mixed integer programming for scheduling surface mount technology lines

Mixed integer programming for scheduling surface mount technology lines

0.00 Avg rating0 Votes
Article ID: iaor20022287
Country: United Kingdom
Volume: 39
Issue: 14
Start Page Number: 3219
End Page Number: 3235
Publication Date: Jan 2001
Journal: International Journal of Production Research
Authors:
Keywords: programming: mathematical
Abstract:

This paper presents new mixed integer programming formulations for blocking scheduling of SMT (Surface Mount Technology) lines for printed wiring board assembly. The SMT line consists of several processing stages in series, separated by finite intermediate buffers, where each stage has one or more identical parallel machines. A board that has completed processing on a machine may remain there and block the machine until a downstream machine becomes available for processing. The objective is to determine an assembly schedule for a mix of board types so as to complete the boards in a minimum time. Scheduling with continuous or with limited machine availability is considered. Numerical examples and some computational results are presented to illustrate applications of the models proposed.

Reviews

Required fields are marked *. Your email address will not be published.